Project experience

Systems shaped around real sites.

Recent Hunter Grid and Solar projects, alongside earlier work delivered through Sugar Hill Contracting by the same experienced team.

03 / Solar + battery / team experience

400-acre cattle farm energy system

A 20 kW solar system, 120 kWh Deye battery and 50 kVA three-phase hybrid inverter now support the house, machine sheds and stock-water pumps. The existing grid connection was retained as backup. Delivered through Sugar Hill Contracting by the same team now behind Hunter Grid and Solar.

04 / Solar pumping / team experience

Independent solar bore pump

For a secluded part of the same cattle farm, the team installed a 3-inch centrifugal DC bore pump powered by three 555 W panels. Automatic control responds to bore-water availability and tank level, with remote status, fault and level monitoring. Designed for 15,000 litres per day.

05 / Off-grid energy / team experience

Lifestyle property off-grid upgrade

An ageing lead-acid system was replaced with a 120 kWh Deye battery, 50 kVA three-phase inverter and 11 kW of new solar. The project included three-phase conversion, trenching, two switchboard upgrades and a 22 kW EV charger. A future expansion to 30 kW of solar is planned.

07 / Controls + SCADA / team experience

Upper Hunter Council RTU upgrades

RTU and SCADA integration work improved remote sensor and alarm monitoring and enabled remote pump and valve control across water and sewer infrastructure, reducing the need for site visits while operations were maintained during the upgrades.

Your project could start here

Bring us the site challenge.

Whether it starts with power, solar, storage or water, we can help define a sensible scope.

Call 0487 412 340

Your enquiry will be sent securely to Hunter Grid and Solar. We’ll use the details provided to respond to your request.